Track workouts, celebrate PRs, generate personalized plans, and see what's actually working — with training intelligence that respects your experience. No account. 100% private.
Built on a curated exercise library with animated demonstrations. Professional tools. No fluff.
Progress Check per muscle, plateau detection, volume analysis & smart weight suggestions. All on-device.
Explore Training Intelligence →Personalized training plans in 60 seconds. Science-based, tailored to your goals, experience & equipment.
Real-time PR detection during training. Instant celebrations on iPhone & Watch.
Full workout control from your wrist. Rest timer, heart rate, PR alerts. Wear OS coming soon.
Train at multiple studios with separate PRs, exercises & weight units.
Science-based targets per muscle. Know when to push, when to rest.
Professional PDF workout reports with full training history and volume analytics.
6 tiers from Starter to GymPsycho. Earn your rank through effort, consistency, and PRs.
Switching apps? Import your entire training history with one tap. AI insights from day one.
Built by a lifter. For lifters who already know what they're doing.
No account. No sign-up. Start training in seconds.
Your device only. No tracking, no ads. Ever.
Only true PRs count. No fake records from reducing weight.
PDF exports, complete history. Never locked in.
Smart insights stay on your phone. Never uploaded.
Separate PRs, exercises, settings & weight units (kg/lbs) per gym. Switch locations in one tap.
I didn't set out to build a fitness app.
I set out to fix a problem in my own training.
After years of serious lifting, every app felt wrong: too slow, too bloated, too generic — built for casual users, not for people who actually train.
So I built GymPsycho.
No accounts. No ads. No social feed.
Just clean data, real PRs, and tools that work under the bar.
Every feature exists because it solved a real problem in my own training. Nothing more. Nothing less.
Features that make training faster, smarter, and more rewarding.
Weight. Reps. Done.
Personalized. Science-based.
3D demos for 277 exercises.
Auto-detected. Celebrated.
Volume per muscle group.
Separate PRs. Any location.
6 tiers. Earn your level.
Workout from your wrist.
Start free, upgrade when you're ready.
Everything to get started
or $6.99/month · 14-day free trial
No account. No credit card. Cancel anytime.
Quick answers to common questions about GymPsycho.
Download GymPsycho for free. No account needed.
Free forever · Pro from $6.99/month